WAM SAUDI

News

      5 Best Practices In Temperature-Controlled Logistics Segment

      Cold chain logistics happen to be an imperative solution that sectors such as poultry and seafood, pharmaceuticals, food, chemical industries, and agricultural products need. It...

      FPS partners with Nike to launch hydrogen-powered container ship

      Future Proof Shipping (FPS) launched the first hydrogen-powered zero-emissions inland container ship on 25 May, with the aim of a zero-carbon future. The H2 Barge...

      Manchester Metrolink contracts DB ESG for tram safety improvement

      Transport for Greater Manchester (TfGM) has chosen rolling stock engineering consultancy DB ESG, a division of Deutsche Bahn, to deliver a tram safety-improvement programme...

      Alstom to develop first automated metro system in Romania

      France-based Alstom has signed a contract with the Cluj-Napoca City Hall for the development of Cluj-Napoca Metro Line 1 in the Transylvania area of...

      Govia Thameslink moves forward with digital signalling testing

      Govia Thameslink Railway (GTR) has completed static testing of a new digital signalling system on a Class 387/1 Great Northern Electrostar train. Testing of the...

      Subscribe Our Newsletter

      White Papers

      Views from the Industry: The Drone Industry Barometer 2019

      Last year, together with DRONEII, we conducted a Drone Barometer Survey to produce a free whitepaper with perspectives from the drone industry. The paper...

      The Minutes 2017 Movin’on Summit

      From Michelin Challenge Bibendum to Movin’On: a new leg in our collective journey towards sustainable mobility. For almost 20 years, the Michelin Challenge Bibendum was...

      The Minutes 2018 Movin’on Summit

      The mobility industry is in need of a bold action plan to implement the Paris Agreement on Climate Change aimed at a net zero-emission...

      Signing and Lining – The Bigger picture

      How designed assets such as traffic signs and road markings have a wider reach post-handover, and some of processes required to achieve deliverable targets. This...