• Airways
  • Railway
  • Roadways
  • Shipping & Port
Transport Advancement
  • Home
  • News
  • Projects
    Stockholm Metro Expansion

    Stockholm Metro Expansion Backed by €2B EIB Funding

    Highways England unveils plans to widen A12

    Highways England unveils plans to widen A12

    African Development Bank, Africa50 in Landmark Bridge Project Linking Kinshasa and Brazzaville

    Geely Holding to Cooperate with China Aerospace Science and Industry Corporation on Developing Technologies Including Supersonic Trains

    AECOM to provide site supervision services for Malaysia’s East Coast Rail Link project

    Talgo obtains €30 million from the European Investment Bank for Innovation projects

    U.S. Department of Transportation Advances Rail Projects in Florida and Texas

    World premiere of the Mercedes-AMG Project ONE: Mercedes-AMG brings Formula 1 technology to the road

    One of the world’s longest electric car highways will be built in Australia

  • Articles
  • Press Statements
  • Market Reports
    Heavy Duty Vehicle Electrification Driving Transportation

    Heavy-Duty Vehicle Electrification Driving Transportation

    European Rail Freights

    2025-2029 European Rail Freight Transportation Market View

    Intelligent Transportation

    Intelligent Transportation System Market – 2032 Growth Story

    MaaS

    Mobility as a Service – MaaS Set To Witness A Global Demand

    Transportation growth in Tourism

    On-Demand Transportation Throttles Growth in Tourism

    Achieving Global Retail Expansion And Sustained Growth

    Shifting Sourcing strategies with Maersk, Bose & Infineon – Reuters Events

    Austal signs agreement to buy BSE Maritime Solutions

    Austal signs agreement to buy BSE Maritime Solutions

    HPC leads machine learning initiative at Hamburg container terminal

    Chinas busiest port sees growth in sea-rail transport

  • Events
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Projects
    Stockholm Metro Expansion

    Stockholm Metro Expansion Backed by €2B EIB Funding

    Highways England unveils plans to widen A12

    Highways England unveils plans to widen A12

    African Development Bank, Africa50 in Landmark Bridge Project Linking Kinshasa and Brazzaville

    Geely Holding to Cooperate with China Aerospace Science and Industry Corporation on Developing Technologies Including Supersonic Trains

    AECOM to provide site supervision services for Malaysia’s East Coast Rail Link project

    Talgo obtains €30 million from the European Investment Bank for Innovation projects

    U.S. Department of Transportation Advances Rail Projects in Florida and Texas

    World premiere of the Mercedes-AMG Project ONE: Mercedes-AMG brings Formula 1 technology to the road

    One of the world’s longest electric car highways will be built in Australia

  • Articles
  • Press Statements
  • Market Reports
    Heavy Duty Vehicle Electrification Driving Transportation

    Heavy-Duty Vehicle Electrification Driving Transportation

    European Rail Freights

    2025-2029 European Rail Freight Transportation Market View

    Intelligent Transportation

    Intelligent Transportation System Market – 2032 Growth Story

    MaaS

    Mobility as a Service – MaaS Set To Witness A Global Demand

    Transportation growth in Tourism

    On-Demand Transportation Throttles Growth in Tourism

    Achieving Global Retail Expansion And Sustained Growth

    Shifting Sourcing strategies with Maersk, Bose & Infineon – Reuters Events

    Austal signs agreement to buy BSE Maritime Solutions

    Austal signs agreement to buy BSE Maritime Solutions

    HPC leads machine learning initiative at Hamburg container terminal

    Chinas busiest port sees growth in sea-rail transport

  • Events
  • Contact Us
No Result
View All Result
Transport Advancement
No Result
View All Result
Home Bridges

Forth Replacement Crossing Cable-Stayed Bridge, United Kingdom

4th March 2014
in Bridges, Europe, Projects, Roadways
0
SHARES
20
VIEWS
Share on FacebookShare on Twitter

The Forth Replacement Crossing (FRC) is a new cable-stayed bridge to be built over the estuary Firth of Forth in Edinburgh, the capital city of Scotland.

 

It will serve as a replacement crossing for the deteriorating Forth Road Bridge, which provides a vital road link for maintaining the economies of Edinburgh, Fife and the East coast of Scotland.

The FRC Bill was introduced to the Scottish Parliament in November 2009. After being approved by the Parliament in December 2010, the Bill received Royal Assent in January 2011.

In March 2011, Forth Crossing Bridge Constructors (FCBC) consortium was announced as the preferred bidder to build the bridge and connecting roads elements. The consortium, comprising of Dragados, Hochtief, American Bridge International and Morrison Construction, will complete the project at an estimated cost of £790m. The project was initially estimated to cost £0.9bn–1.2bn.

The construction work is anticipated to be started in the third quarter of 2011, with the bridge opening in 2016.
The bridge project will be the biggest single investment by the Government of Scotland. Transport Scotland, which is responsible for all transportation issues across Scotland, is the sponsor of the project.

Forth crossing background

 

The Forth Road Bridge built in 1964 has started showing signs of deterioration due to increased traffic levels and weather conditions. Due to significant corrosion, the main suspension cables have suffered a 10% loss of load bearing strength.

 

After an investigation, the Forth Estuary Transport Authority (FETA) concluded that replacing the cables or other repairs could not be done without disrupting the traffic across the Forth. It was also reported that traffic restrictions for HGVs may be imposed as early as 2017 and that would impact the economy of Lothian and Fife very seriously.

In order to safeguard this economically vital road link, the government decided to build the FRC bridge by 2016. Before any potential restrictions in 2017, traffic from the existing bridge will be transferred to the proposed bridge.

Project

 

The FRC project involves design, construction and completion of a new bridge over the Firth of Forth. It also involves linking the new bridge with approach roads to the north and south of the crossing. An intelligent transport system (ITS) will be installed along the full length of the scheme.

The full length of the FRC scheme is 22km and the road passing over the bridge will be designated as a motorway.

FRC bridge design

 

The proposed bridge will be a 2.7km-long (including approach viaducts) cable-stayed bridge, supported by three slender single column towers with a span of 650m between them. A slender structure, both in terms of the bridge’s deck and tower, has been achieved by adopting a system of crossing stays. This method is implemented by forming a triangle-shaped weaving pattern at the centre of the span, instead of allowing the longest stays to reach half the span.

The bridge platform will carry two lanes of general traffic in each direction. Hard shoulders will be provided to ensure that serious congestion does not happen because of breakdowns, incidents and any maintenance works.

Construction

 

A detailed consultation process was undertaken in order to find out suitable construction compound locations. A code of construction practice has also been developed to limit disturbance from construction activities.

 

Most of the construction work will be undertaken from barges in the Firth of Forth. The transport authority, through the FRC Bill, is seeking provision of three construction compounds – Echline in South Queensferry, Ferrytoll in North Queensferry and the one near Kirkliston on the north-west side of M9 Junction 1A.

Echline Compound is expected to be the main construction compound, managing construction of bridge and southern approach roads.

Ferrytoll Compound will manage construction of the northern bridge viaduct, the Ferrytoll Junction and the A90 improvements. Kirkliston Compound is expected to manage Junction 1A upgrades.

FRC contractors

 

A joint venture (JV) between Jacobs and Arup was appointed as consulting engineer for the design and construction of the new bridge in early 2008. Flint & Neill Partnership, Dissing & Weitling, and EC Harris, other members of the JV, will be responsible for architecture and aesthetics, geotechnics, environment and landscaping, budgeting, statutory processes, and health and safety. Blom was commissioned to carry out aerial and terrestrial survey of the site.

Tags: United Kingdom
Previous Post

Addenbrooke's Access Road, Cambridgeshire, United Kingdom

Next Post

Muenster Adaptive Signal Control System, Germany

Related Posts

Sustainable Aviation Fuel
Airways

Sustainable Aviation Fuel: Regulatory Landscape in 2025

28th May 2025
Stockholm Metro Expansion
Europe

Stockholm Metro Expansion Backed by €2B EIB Funding

28th May 2025
WeRide Partners Tencent
Equipments & Devices

WeRide Partners Tencent Cloud for Global Robotaxi Expansion

28th May 2025
Volvo to manufacture
Press Statements

Volvo to manufacture first-ever Australian-made heavy duty electric trucks as part of nation’s largest-ever order

27th May 2025
Germans to Experience Driverless
Europe

Germans to Experience Driverless Technology in Public Transport with Karsan Autonomous e-ATAK

27th May 2025
JBM New Electric Bus Design
Europe

JBM to Rollout New Electric Bus Designed for European Market

15th April 2025
Next Post

Muenster Adaptive Signal Control System, Germany

Latest Post

Sustainable Aviation Fuel
Airways

Sustainable Aviation Fuel: Regulatory Landscape in 2025

28th May 2025
Airlines Adopt Innovative
Airways

Airlines Adopt Innovative Ways to Procure Aircraft Parts

2nd May 2025
Airways

DHL & Senior Aerospace UPECA Partner on SAF Solutions

6th March 2025
Airways

Ireland’s First International Air Delivery of Medicines on 100% Sustainable Aviation Fuel

25th February 2025
Airways

European transport groups call for more green fuel

18th February 2025
Global Demand For Air Cargo Shrinks Even Further In December
Airways

Cathay Cargo Eyes Indian Airlines For Hong Kong Facility

26th September 2024
Transport Advancement

About Us

Transport Advancement is a leading information centric website for latest updates within the industry. We cover Railway, Road Traffic, Airways, Shipping & Port and run with an objective to provide knowledge driven content to our readers and subscribers in various forms like news, projects, upcoming events.

Subscribe Us

Resources

  • Advertise with us
  • Contact Us
  • Newsletter Archive
  • Download Mediapack
  • Newsletter Subscription

System

  • Search
  • Site map
  • RSS Feed
  • Airways
  • Railway
  • Roadways
  • Shipping & Port

© 2022 Copyright Value Media Services 2022 All rights reserved.

No Result
View All Result
  • Home
  • News
  • Projects
  • Articles
  • Press Statements
  • Market Reports
  • Events
  • Contact Us

© 2022 Copyright Value Media Services 2022 All rights reserved.